Translators, Allocations, and the FCC with Dave Doherty

The FCC has a filing window for new Non-commercial/educational (NCE) FM stations in 2021. Indeed, it’s been over ten years since the FCC accepted applications for new, full-power NCE construction permits. The window, expected to be in “early 2021,” will allow non-profit organizations, schools, and native tribes to apply for Construction Permits in the NCE band – 88.1–91.9 MHz on the FM dial. FCC Consulting Engineer, Dave Doherty, joins us to discuss this topic and more.

Show notes:

Guest

Dave Doherty – Principal at Skywaves Consulting, LLC

Hosts

Chris Tobin, IP-Solutionist
Kirk Harnack, The Telos Alliance, Delta Radio, & South Seas Broadcasting

Follow Kirk on Twitter – @kharnack
Follow TWiRT on Twitter – @TWiRTshow and Facebook

Sponsored by

Broadcasters General Store, with outstanding service, saving, and support. Online at BGS.cc.
Broadcast Bionics – making radio smarter with Bionic Studio, visual radio, a social media tools at Bionic.radio.
Angry Audio – with StudioHub cables and adapters. Audio problems disappear when you get Angry at AngryAudio.com.
Nautel – offering informative webinars at Nautel.com/webinars
And MaxxKonnectWireless – Prioritized High Speed Internet Service designed for Transmitter Sites and Remote Broadcasts.